CorrX . . . Application Demo

See a brief demonstration of the CorrX surface decontamination process . . .     Continue Reading →

Sandblasting + Rain Dilemma = No Problem!

(Houston, TX - near the Houston Ship Channel) – This was a very interesting project.  We were called out to the site 14 days after the sandblasting was ... Continue Reading →

$500,000 Per Diem Demurrage: PREVENTED

Two large diameter tank bottoms were being re-lined.  The first tank, 300′ in diameter, had been abrasive blasted and pressure washed four times.  All efforts ... Continue Reading →